Over the weekend, Glaslough - which has one street and a population of around 400 people - suffered its first ever traffic jam, with 450 vans, refrigerated trucks, cars and flatbed lorries dropping off tonnes of equipment. At the castle, three 500 ft marquees joined by covered tunnels have been erected to house a large dance floor, sound systems and seating. New jetties and wooden decking have been constructed by the large lake so guests will be able to watch the elaborate beginning of the ceremony. Sir Paul and Heather will arrive in a vintage 40ft yacht, shipped in from Europe and lifted into the water with a nine tonne crane. The crane cost £25,000 to hire.