When the work is completed, however, the M25 will be rid of a notorious bottleneck that has put a stranglehold on the motorway for more than a decade. In the first stage of the operationthe 650-metre tunnel will be boosted from three lanes in each direction to four, giving traffic more room to merge after it joins the motorway at junction 25.