Rail
The Southern rail firm, which operates routes from the Sussex coast, including the Brighton Line, into Victoria, was again the worst affected. It had delays on services to Brighton, Three Bridges, Gatwick Airport, Redhill, East Croydon, London Bridge and Victoria. At least 30 trains were cancelled. Southeastern suspended services between Hastings and Tunbridge Wells, and its trains through Sevenoaks and Ashford were also affected. Eurostar continued to run a limited service from St Pancras.