The Health and Safety Executive, in a preliminary report, revealed that one pair of the 2in-wide nuts had been found missing from the set of points 2182a south of Potters Bar station. They were found lying beside the track during an inspection carried out by three employees of contractor Jarvis Rail on 1 May, 10 days before the crash.