The aerospace giant has had a rough ride recently due to rotor blade problems on the Trent 1000 engine and slower production of the Trent 7000, cutting forecasts from 550 large engines delivered to 500. The firm gave an upbeat outlook on deliveries for 2019, predicting a “significant increase” in production and delivery volumes.